Home  |  Calendar  |  Contact Us  |  Site Map  |  Employee Portal
The City of La Crosse Wisconsin
Monday, May 20th - 3:38 AM
The City of La Crosse Wisconsin

Go To Search

Email this Page to a Friend Print this Page RSS Feeds Alternate Side Parking AlertsFollow Us on Twitter Follow Us on Facebook
Interest Ietms
19.06 Method of Excavation
All openings cut in concrete pavement shall be sawed to a depth of two (2) inches before breaking out such pavement.  No more than one-half the width of the street shall be opened up.  All openings and excavations shall be made as to cause the least obstruction to the street or alley, so as not to interfere with the passage of water along the gutters, and shall remain open no longer than necessary to make connection or complete the work.

















Accessibility  |  Copyright  |  Disclaimer  |  Privacy Policy  |  Powered by CivicPlus
La Crosse
400 La Crosse Street, La Crosse, WI 54601
Grand River Great City, La Crosse, Wisconsin